It's All Fun and Games Until Someone Gets in the Critical Path, 4.25 x 11.5 Inch Aluminum Sign, Cubicle Decor & Accessories for Cube or Office, Project Manager, Coworker, Boss Gifts AL-0412-RK3085

It's All Fun and Games Until Someone Gets in the Critical Path, 4.25 x 11.5 Inch Aluminum Sign, Cubicle Decor & Accessories for Cube or Office, Project Manager, Coworker, Boss Gifts AL-0412-RK3085

Product ID: B07H6Q9Y95 Condition: New

Available in other options.
Variations
$ 135
includes Duties & VAT
Delivery: 10-20 working days
Ships from USA warehouse.
Secure Transaction
VISA Mastercard ozow

Product Description

It's All Fun and Games Until Someone Gets in the Critical Path, 4.25 x 11.5 Inch Aluminum Sign, Cubicle Decor & Accessories for Cube or Office, Project Manager, Coworker, Boss Gifts AL-0412-RK3085

  • Measures 4.25 x 11.5 inches. Make your work space stand out with our office humor signs.
  • Give the gift of humor. Perfect for birthdays, promotions, Christmas or just because.
  • Weather, rust & fade resistant. Use indoors/outdoors in yard, garden, deck, patio.
  • Our signs are made of durable aluminum, not flimsy tin, and have 4 holes for hanging.
  • Proudly made right here in the USA by a family-owned and operated manufacturer.

Entertaining & Unique Metal Art for the Workplace

Made here in the USA from recycled 24-gauge steel. Each piece is:

- Cut to size and coated in a white base paint.
- Drilled in all four corners with holes for easy mounting.
- Powder coated and baked with a special layer that will accept the ink.
- Artwork is printed on a special transfer paper, which is then heat pressed onto the prepped steel to bake the design onto the surface of the sign.

What you get is a delightful piece of art to adorn your wall! There are many options for how to display your new piece of art. We've provided just a few ideas below:

- Screw the piece directly on to walls, wood and other surfaces (screws not included). This can be a great choice where there are active kids who tend to knock stuff off shelves and walls!
- Use double-sided tape to help with placement before setting screws (tape not included).
- Use standoff screws, which puts a spacer between the wall and the art for a more refined look (screws not included).
- For a more rustic look, find some reclaimed wood and cut it to size (about 1" larger on all four sides). Stain it to coordinate with your colors and then screw the sign onto the board. Use wall hangers to attach it to your wall or place on a shelf.
- Attach an arrangement of signs and other items to a stained shipping pallet and hang that on your wall.
- Glue magnets to the back and easily attach the sign to anything metal (magnets not included).

It's fine to hang your sign outdoors, but avoid direct sunlight to keep the colors true for years to come.

Technical Specifications

Country
USA
Brand
Alamazookie
Manufacturer
Alamazookie
Binding
Kitchen
ItemPartNumber
RK3085_4x12
Model
RK3085_4x12
Color
It's All Fun & Games - Critical Path