Earned Value Management System Manual: EVMS Systems Manual

Earned Value Management System Manual: EVMS Systems Manual

Product ID: 0615676219 Condition: New

$ 321
includes Duties & VAT
Delivery: 10-20 working days
Ships from USA warehouse.
Secure Transaction
VISA Mastercard ozow

Product Description

Earned Value Management System Manual: EVMS Systems Manual

  • Used Book in Good Condition

Technical Specifications

Country
USA
Brand
Lgm International, LLC
Manufacturer
LGM International, LLC
Binding
Paperback
PartNumber
colour illustrations
IsAdultProduct
Height
11
Length
8.5
Weight
0.8598028218
Width
0.39
NumberOfItems
1
Author
Regan, DR. Sean Thomas, Regan, Dr. Sean Thomas

You might also like

Renditions Gallery Twelve Days of Christmas Wall Art, Four Calling Birds, Cute Winter Artwork, Holiday Song Decor, Premium Gallery Wrapped Canvas, Ready to Hang, 16 in H x 16 in W, Made in America

Renditions Gallery Let it Snow Couple Wall Art, Christmas & Winter Artwork, Cute Pair of Snowmen Holiday Decor, Premium Gallery Wrapped Canvas, Ready to Hang, 40 in H x 40 in W, Made in America

Renditions Gallery Poinsettia Leaves Wall Art, Christmas & Winter Artwork, Festive Red & Green, Flowers, Floral, Premium Gallery Wrapped Canvas Decor, Ready to Hang, 40 in H x 40 in W, Made in America (WC24-91535-4040)

Renditions Gallery A Gift from Santa Wall Art, Little Girl with Present, Winter Artwork, Holiday Decor, Red & White, Premium Gallery Wrapped Canvas, Ready to Hang, 10 in H x 10 in W, Made in America

Renditions Gallery Merry Christmas & A Happy New Year Wall Art, Winter Artwork, Festive Ornament, Snowflake, Premium Gallery Wrapped Canvas Decor, Ready to Hang, 10 in H x 10 in W, Made in America

Renditions Gallery Holly Leaves Wall Art, Christmas & Winter Artwork, Festive Red & Green, Flowers, Floral, Premium Gallery Wrapped Canvas Decor, Ready to Hang, 10 in H x 10 in W, Made in America

Renditions Gallery Prancer's Christmas Pudding Wall Art, Cute Winter Decor, Vintage Faux Wood Look, Festive, Premium Gallery Wrapped Canvas, Ready to Hang, 40 in H x 40 in W, Made in America

Renditions Gallery Christmas Word Art Wall Art, Cute Winter Decor, Colorful Wrapping Paper Like Designs, Snowflakes, Premium Gallery Wrapped Canvas, Ready to Hang, 24 in H x 24 in W, Made in America